SURFACE PREPARATION
- To ensure proper adhesion of the product have to the surface be cleaned from dust, grease, oil, peeling old paint, rust, mold or moisture.
- Mix the components A and B in a ratio 4:1 by volume stirring continously.
- Dilute the mixture if needed with epoxy primer up to 5%
- The mixture can be used for about 24 hours.
- The product has all the mechanical strength after 20-30 days
Attention: If we mix components A and B the product can't be stored for future use.
APPLICATION CONDITIONS
Do not apply at temperatures below 6°C and above 40°C and at relative humidity above 80%. Adverse conditions in the application can alter the final properties of product.
APPLICATION TOOLS
- Brush
- Roller
- Airless spayer
During working keep tools "liquid" in the container or the container with the product. Drain well the product of the tools back in the box and clean immediately with epoxy thinner. If product dries only with strong detergents. Do not empty washings into the groundwater.
12m2 / Lt per coat
5% epoxy thinner
Surface drying; 2 hours depending on the weather conditions.
For Technical Data Sheet contact the company by email or by phone.