SURFACE PREPARATION
- To ensure proper adhesion of the product have to the surface be cleaned from dust, grease, oil, rust, mold or moisture etc.
- Stir well the product and apply directly on surface
- The product has all the mechanical strength after 20-30 days
APPLICATION CONDITIONS
Do not apply at temperatures below 6°C and above 40°C and at relative humidity above 80%. Adverse conditions in the application can alter the final properties of product.
APPLICATION TOOLS
- Brush
- Roller
During working keep tools "liquid" in the container. After use clean well the tools with White spirit. If product dries only with strong detergents. Do not empty washings into the groundwater.
8-10m2 / Lt per coat
1 - 2 hours depending on applying conditions
Ready to use
Download the technical data sheets of the product: TDS DOWNLOAD