SURFACE PREPARATION
- To ensure proper adhesion of the product have to the surface be cleaned from dust, grease, oil, rust, mold or moisture etc.
- Sand with an appropriate abrasive paper the surfaces that have been passed with other TEAK OIL materials, so that the wood pores open and the material can imbue in the surface.
- Apply a coat of the product with a spft cloth or with brush
- For surfaces exposed to extreme weather conditions, apply after 2 days the second coat
The product has all the mechanical strength after 20-30 days
APPLICATION CONDITIONS
Do not apply at temperatures below 6°C and above 40°C and at relative humidity above 80%. Adverse conditions in the application can alter the final properties of product.
APPLICATION TOOLS
- Brush
- Soft cloth
During working keep tools "liquid" in the container. After use clean well the tools with warm water and soap. If product dries only with strong detergents. Do not empty washings into the groundwater.
10-15m2 / Lt per coat
Ready to use
Touch dry after 2 - 3 hours. Recoatable after 2 days
download the technical data sheets of the product: TDS DOWNLOAD