SURFACE PREPARATION
- To ensure proper adhesion of the product have to the surface be cleaned from dust, grease, oil, peeling old paint, rust, mold or moisture.
- Mix the components A and B in a ratio 4:1 by volume stirring continously.
- Dilute the mixture with epoxy primer up to 10%
- Apply the product.
- The mixture can be used for about 24 hours.
- The product has all the mechanical strength after 20-30 days
Attention: If we mix components A and B the product can't be stored for future use.
APPLICATION CONDITIONS
Do not apply at temperatures below 6°C and above 40°C and at relative humidity above 80%. Adverse conditions in the application can alter the final properties of product.
APPLICATION TOOLS
- Brush
- Roller
- Airless spayer
During working keep tools "liquid" in the container or the container with the product. Drain well the product of the tools back in the box and clean immediately with epoxy thinner. If product dries only with strong detergents. Do not empty washings into the groundwater.
12-14m2 / Lt per coat
10% epoxy thinner
Touch 30 min.
Recoated after 1 hour.
Download the technical data sheets of the product: TDS DOWNLOAD