SURFACE PREPARATION
- To ensure proper adhesion of the product, surfaces must be clean, dry and free from all defective and poorly adhering material, dust, grease, oil, rust, mold or moisture etc.
- Apply the product with brush or roll and let it dry for 1 - 2 hours.
- Apply the top coat.
- The product has all the mechanical strength after 20-30 days
APPLICATION CONDITIONS
Do not apply at temperatures below 6°C and above 35°C and relative humidity above 70% or if there is a chance of rain or frost in the next 48h.
Adverse conditions and not following the instructions in the application can alter the final properties of product.
APPLICATION TOOLS
- Brush
- Roller
During working keep tools "liquid" in the container. Drain well the product of the tools back in the box and clean immediately with warm water and soap. If product dries, clean only with strong detergents. Do not empty washings into the groundwater
WARNING: Wear protective gloves/protective clothing/personal protective equipment for eyes/face.In case of contact with eyes, rinse carefully with plenty of water for several minutes. If contact lenses are present, remove them if possible. Continue to rinse.
Call immediately the DETECTION CENTER 210 7793777.
18-22m2 / kg on properly prepared surfaces
5 - 10% water
1 - 2 hours depending on conditions